A CSI division is one of the numbered groups of work in MasterFormat, the standard used to organize construction specifications and estimates.

By IntelCost Team ·

A CSI division is one of the numbered groups in MasterFormat, the system published by the Construction Specifications Institute (CSI) and Construction Specifications Canada for organizing construction information by type of work. Division 03 is concrete, Division 08 is openings, Division 26 is electrical, and so on.

MasterFormat division groups. The divisions fall into groups; most building work sits in 02 to 49.Division 00Procurement and contracting requirementsDivision 01General requirementsDivisions 02 to 19Facility construction: concrete, masonry, finishesDivisions 20 to 29Facility services: plumbing, HVAC, electricalDivisions 30 to 39Site and infrastructure: earthwork, utilitiesDivisions 40 to 49Process equipment
The divisions fall into groups; most building work sits in 02 to 49.

How it works

MasterFormat runs from Division 00 to Division 49. Some numbers are reserved for future use, so not every division exists. The divisions sit in groups:

  • Procurement and Contracting Requirements: Division 00.
  • General Requirements: Division 01.
  • Facility Construction: Divisions 02 to 19.
  • Facility Services: Divisions 20 to 29.
  • Site and Infrastructure: Divisions 30 to 39.
  • Process Equipment: Divisions 40 to 49.

Within each group, some division numbers are reserved and have no work in them yet.

Inside each division, work is broken into sections with six-digit numbers in three pairs. For example, 03 30 00 is Cast-in-Place Concrete within Division 03. The more digits filled in, the more specific the section.

The current layout dates from the 2004 edition. Older specs and some estimators still use the earlier 16-division format, so an old "Division 15" (mechanical) maps to Divisions 21, 22 and 23 today.

Common divisions in an estimate

Division Title
01 General Requirements
03 Concrete
04 Masonry
05 Metals
06 Wood, Plastics, and Composites
07 Thermal and Moisture Protection
08 Openings
09 Finishes
22 Plumbing
23 Heating, Ventilating, and Air Conditioning (HVAC)
26 Electrical
31 Earthwork
32 Exterior Improvements
33 Utilities

Example

Say you are filing four items from a takeoff (example items):

Item Division Section
4 in slab on grade 03 Concrete 03 30 00 Cast-in-Place Concrete
Hollow metal door frames 08 Openings 08 11 13 Hollow Metal Doors and Frames
Recessed light fixtures 26 Electrical 26 51 00 Interior Lighting
Mass excavation 31 Earthwork 31 23 00 Excavation and Fill

Filed this way, the quantity takeoff lines up with the specification book, and each sub's scope can be pulled out by division.

Why estimators use it

  • Scope checks: going division by division through the specs is a simple way to find work the drawings do not show.
  • Sub packages: most trades bid by division or section.
  • Comparisons: costs filed the same way on every job can be compared from job to job.